Goal: Migration from Old Two Site to New Two Site w/ DR protection
Key Requirements:
- Synchronization while maintaining protection
- Minimal downtime during migration
- Allow for transition to new SRDF replication
Test Plan:
- Initial testing environments setup
• Setup a 3.5 TB DB2 environment
• Setup IVP and IOdriver on testing hosts
• Setup SRDF on Old Two Site with DR protection
• Prepare RDF capable devices on New two Sites
• RDF will be on Fiber and Gig/e type links
• Varied types of drive sizes and protection will be used ex mod-54,mod-27,mod-9,mod-3 and Rain-5, Raid-10, Raid-1
• Distance up to 1,700 miles / 2,800 km will be used
- Migration Procedure(s)
• Add New Sites one at a time (SRDF/A => Concurrent => Concurrent Cascading)
• Link Old Two Sites and New Two Sites (SRDF/A, RDF/Ad Copy disk => Concurrent Cascading)
- Data verification and Consistency Check on New Two Sites
• Verify that TPC-C database can be start on Site C (and D) without media recovery/data loss/data corruption
• Verify DB2 Data
• IVP
Summary:
- Our team (Use Case Group) will be focusing on scalability and data consistency during the execution of migration procedure(s).
- A total of >4000 devices and 4 RDF groups will be used in Mainframe testing environments